When repetitive production is reported, by default, system will use build schedule to purge the production demand from the system. If you are queuing repetitive production then production demand removed from the system may not be the earliest in the queue but the oldest build schedule (please refer to earlier post build vs production schedule). CMS can be configured to remove production demand based on queue number assigned to repetitive production. This can be configured using production master table and selecting reporting tab.